[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
PC: Youngstown, E&A Branch, and P&LE
- Subject: PC: Youngstown, E&A Branch, and P&LE
- From: Jerry Jordak <jer@xxxxxxxxxxxxx>
- Date: Mon, 29 Sep 2003 23:11:46 -0400
Time to put on the thinking caps and turn on your wayback machines...
I was doing some research last night through my copy of my 1969 PC Through
Freight Schedules book. Specifically, I was looking for all train traffic
that would have used the ex-PRR E&A Branch between Rochester, PA, and
Youngstown, OH. (Today this trackage is part of Norfolk Southern's
Youngstown Line.)
In checking the origin/destination listings, I found a number of trains
which showed as originating and terminating in Youngstown. However, to my
surprise, most of them used Gateway Yard, which was on the Pittsburgh &
Lake Erie, as opposed to Hazelton Yard, which was the main PRR yard in
Youngstown.
Specificially, the only train I could find that originated at Hazelton was
YA-1, which worked the ex-PRR PY&A Branch from Youngstown and Niles to
Ashtabula. The following trains, which ran over the E&A Branch, worked at
Hazelton enroute:
SC-3 New Castle-Canton
SC-4 Canton-New Castle
PY-3 Conway-Ashtabula
PY-4 Ashtabula-Conway
CNC-1 New Castle-Cleveland
CNC-2 Cleveland-New Castle
On the other hand, the following trains originated or terminated at Gateway
Yard:
BP-1 Benson Mines-Youngstown
CDB-4 Elkhart-Youngstown
GP-3 Youngstown-Newell
PW-4 Newell-Youngstown
WM-4 Cleveland-Youngstown
WM-6 Youngstown-Dickerson Run
And these stopped at Gateway enroute:
PC-1 Dickerson Run-Elkhart
PS-10 Pittsburgh-Buffalo
GP-1 Buffalo-Becks Run
GC-3 Pittsburgh-Cleveland
Now while the Pennsy Ft. Wayne line was obviously the primary mover of
traffic from Pittsburgh to points west, it seems that the P&LE, which was
controlled by Penn Central still at this point, was probably the secondary
main line out of Pittsburgh to the west. (I'm not including the Panhandle
towards Columbus in this discussion, but rather focusing on points
northwest, like Youngstown, Cleveland, Toledo, Chicago, Detroit, etc.) Is
this a valid conclusion? It seems like Penn Central was treating the P&LE
as just another route on its system, especially with having trains running
from P&LE points to far-off locations like Elkhart and Benson Mines. (I
believe Benson Mines is in far upstate New York, where they mined iron ore
for steel mills, as the schedule book mentions blocks of ore in the train'
makeup.)
In addition, I'm trying to figure out is if any other traffic used the E&A
Branch between New Castle and Youngstown. Besides the three pairs of trains
mentioned above, would there have been any other movements on that line?
Perhaps coal or iron ore trains? Possibly ore trains from the Bessemer &
Lake Erie? I seem to remember hearing that ore from the B&LE was
interchanged with the PRR E&P Branch at Shenango (near Greenville) and
moved south to New Castle and then west over the E&A to Youngstown. Was
this actually done?
What I thought was interesting too was the schedule pages for trains PY-3
and PY-4 mention TTX (piggyback) cars operating between Conway and
Hazelton, and so there was probably a piggyback ramp at Hazelton. I thought
that was kind of neat, as it meant there was piggyback cars running over
the E&A Branch.
Apologies if you have no idea what part of Penn Central system I'm talking
about, but I figured that since the list has been a little quiet that this
might start some good discussion. And, it will help me with planning
prototypical operations for my under-construction model railroad. :-)
Thanks,
-JWJ
Home |
Main Index |
Thread Index