[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: PC: [Fwd: Penn Central C628 and C424]



I was talking with Steve Stewart this last weekend. The window glass is being
produced as we speak this was the last piece needed for completion. The trucks
and drive train have been assembled all they were waiting for was the fuel
tank which is done and the window glass. Steve said they should start shipping
within two weeks. As soon as they are ready to go I'll post the news.    
                                                                     Waiting
like you,
                                                                        Ken
McCorry 


Home | Main Index | Thread Index